Cl15: CL15 — OM | OM Seating

Office Master CL15 Classic Professional Lab and Healthcare Stool

NOTE: The above video demonstrates general adjustment capabilities which vary depending on the model of the chair. The actual functions & appearance of your chair/arm may differ significantly from the video & illustration shown above. For a list of actual capabilities, please see the features list below or call and ask one of our knowledgeable customer service representatives at 1-888-456-3746. (Some options are available as an upgrade option and must be selected at time of purchase).

Description

Office Master’s CL15 Classic-Professional stools feature a
unique back design that serves as back support, body side support, or
even abdomen support.
A special foot-activated height mechanism is an added feature that
provides hands-free operation of the adjustable height control.

Specifications

Overall Width 25″
Overall Height 28 — 36″
Back 13″ W x 11″ H
Seat 16″ diameter
Seat Height 16″ — 21″
COM 1 yard
Carton Weight 30 pounds
UPS Weight 33 pounds
Arms N/A
Weight Capacity 250 lbs
Warranty 12 years Limited

Features

  • Pneumatic lift
  • Chrome base
  • Safety soft casters
  • Foot activation
  • Back height adjustment
  • Fabric panel back
  • Unique back support

Product Options/Accessories

Model CL15
Manufacturer Office Master Chairs
Part Number CL15
Overall Width 25″
Overall Height 28 — 36″
Back 13″ W x 11″ H
Seat 16″ Diameter
Seat Height 16 — 21″
COM 1 yard
Carton Weight 30 lbs
UPS Weight 33 lbs
Arms N/A
Warranty 12 year limited
Weight Capacity 250 lbs
Customer reviews
  • 1 stars


    0

  • 2 stars


    0

  • 3 stars


    0

  • 4 stars


    0

  • 5 stars


    0

(0 out of 0)

Share your thoughts with customers:

  • Brochure Office Master CL15
  • Office Master Chair Arm Types
  • Assembly Classic Stool
  • General Classic Stool
  • Certificate Classic Exam Room Stools
  • Sales Tutorial Classic Exam Room

Limited Warranty

Office Master, Inc. (OM) warrants to the original purchaser that its products
are free from defects in materials and workmanship for the applicable warranty
period, as indicated below.

Should any item fail, OM will at its sole discretion repair or replace, with
a comparable product or part, any item found to be defective as a result of
normal commercial use (i.e., a single 8-hour shift, 5 days per week).

This warranty does not apply to items subjected to abuse, misuse, neglect,
alteration, or damage caused by shipment, storage, accident, fire, flood, or act
of God.

Lifetime Limited Warranty — The OM5 Series (including the OM5 Active
sub-series), Truly. Series, and Ginny are covered by a lifetime limited warranty
on all structural components as defined below.

12-Year Limited Warranty — Unless otherwise specified, all models not
classified as budget or 24/7 or heavy-duty are covered under a 12-year limited
warranty on all structural components as defined below.

7-Year Limited Warranty — Unless otherwise specified, all models classified as
budget or 24/7 or heavy-duty are covered under a 7-year limited warranty on all
structural components as defined below. Budget series include: BC, SG, ST, and
WS.

Warranty Terms — Within a given model’s applicable warranty period, all
structural components, including gas cylinders, wood, metal and plastic parts
(i.e., chair frames, bases and control handles) are guaranteed against
structural failure when under normal commercial use. All OM seating comes with a
default 275 lbs. weight capacity limit unless otherwise specified by OM.

For all models, consumable items (i.e., casters, glides, etc.) are covered by
a 5-year normal commercial use warranty.

Fabrics and Foam — OM in-stock upholstery & foam cushions are covered by a
5-year normal commercial use warranty. Normal wear and tear on fabrics such as
wrinkling, dirt accumulation or gathering is not covered. This includes Truly.
Series “Jackets” and “Wraps”. Natural, minor variations may exist in color,
surface, grain or texture of upholstery materials. As a result, any such
variations are not warranted. COM/COL and graded-in fabrics are not covered.

Claims Procedure — Should any item fail, contact the Dealer from whom it was
purchased. A photograph of the damage(s)/issue(s) and of the “born-on” label
underneath the seat will be required to help OM determine the cause and extent
of any issues. If it is determined that a return is necessary, return that item
and its product proof of purchase to the Dealer, whereupon that Dealer will send
both to OM, freight prepaid. OM will repair or replace the defective part at its
sole discretion and return it to the Dealer, freight prepaid. Please email
related photos and details for any warranty claims to
[email protected].

Returns — Written authorization from OM is required prior to a Dealer
returning any failed or defective parts to OM. Any returned defective part(s)
will NOT be accepted without this prior written authorization, or a “Returned
Materials Authorization” (RMA) # assigned to it.

Warranty Labor — This warranty exclusively covers the repair or replacement of
OM parts as determined by OM and does NOT cover any portion of field labor or
service and does NOT cover any portion of field labor or service. For
information regarding OM’s non-warranty shop time and related charges, please
reference a current copy of OM’s pricebook, in the Terms and Conditions section.

LEDLinear-E CL15-53W-4000-WH-EM1 | OPPLE Lighting

Specifications

Packaging

Accessoires

Specifications

Electrical data

Max. system power 53 W
Voltage type AC
Nominal voltage 220|240 V
Frequency 50/60 Hz
Power factor 0. 9
Max. inrush current 180 A
Inrush time 2 µs
Max. number of luminaires per miniature circuit breaker B16 (MCB) 26
Max. number of luminaires per miniature circuit breaker C16 (MCB) 44
Max. number of luminaires per miniature circuit breaker C13 35
Max. number of luminaires per miniature circuit breaker C10 27

Photometrical data

Equivalent to TL 2x58W
Rated luminous flux according to IEC 62722-2-1 6360 lm
Luminaire efficacy 120 lm/W
Colour rendering index (CRI) ≥ 80
Colour consistency (SDCM) 3
R9 8.4

Light technical data

Beam angle 110°
UGR ≤ 22

Lifespan

Lifetime (L70) 70000 h
Lifetime (L80) 50000 h
On-/Off-cycles 100000

Capabilities

Dimmability On-Off

Certificates and standards

Degree of protection (IP) IP44
Impact strength IK06
Protection class I
Glow wire test 650°C
Risk group (EN 62471) RG0
With control gear Yes
Type of control gear LED operating device current-controlled
Driver failure rate (at 5,000 hrs)
Housing material Steel
Housing colour White
Optical material PMMA
Finishing White RAL9003
Length 1500 mm
Width 175 mm
Height/depth 74 mm
Weight 3. 733 kg
Application temperature 25°C
Operating temperature -10|40°C
Storage environment -25|50°C
EAN code EU HS Code Packaging Amount Size (L x W x H) Weight
06941497737526 94051190 Carton 1 195 x 85 x 1555 mm 4.233 kg

Accessoires

LED Module sensor CT

Product Code

140060553

Movement sensor

LEDSmart-Relay-500W

Product Code

506006003100

Signal converter

Downloads

Well KL-15 | Reinforced concrete products from GK Blok

Description

Elements of concrete wells The working chambers of KL-15 sewer wells are prefabricated reinforced concrete structures, consisting of various reinforced concrete elements and designed for engineering and drainage communications, various communication networks and sewer septic tanks. Concrete wells are universal for the construction of necks and trunks of prefabricated wells, which are joined by welding brackets.
nine0003

Reinforced concrete wells are popular in private buildings and in areas where water supply systems, drinking wells and small sewers are built from them. Road construction also actively uses this type of reinforced concrete products. A concrete ring, together with a well cover and a bottom corresponding to the diameter of the well common to all elements, constitute a complete structure. To the elements of the wells, the working chambers of the KL-15 sewer wells are subject to strict quality requirements prescribed in GOST 8020-90.

The design of the elements of the wells, the working chambers of the KL-15 sewer wells is quite simple and is a frame made of metal reinforcement 6-10 mm thick, covered with concrete and having the required shape. The production process is mainly carried out by vibrocompression. The steel reinforcement cage is covered with a layer of heavy concrete and subjected to vibration, which gives the concrete the required density. The result is durable elements for high quality reinforced concrete wells with a thickness of 60-140 mm. In the production of elements of reinforced concrete wells, heavy concrete grades from M200 to M500 are used, which guarantees a margin of safety and crack resistance. nine0003

Our company performs assembly and installation of working chambers of sewer wells KL-15. For installation of reinforced concrete wells and elements of wells, please call (812) 336-87-96.

The main requirements for concrete for wells are strength, density and water tightness (W4), since concrete wells are buried below the groundwater level. Elements of the working chambers of KL-15 sewer wells have low water absorption and can interact with liquids for a long time. To use these elements in aggressive soils, special sulfate-resistant or other cements are used in production that tolerate reactive or chemical environments well. nine0003

Since the wells are deep in the ground and do not experience sudden temperature changes, the requirements for frost resistance of the elements of reinforced concrete wells, the working chambers of KL-15 sewer wells are calculated individually and depend on the climatic conditions of the installation site.

Designed to withstand loads from the cover and each other, the elements of the wells, the working chambers of the KL-15 sewer wells, are reinforced with frames made of hardened steel of the At-IIIC and At-IVC and A-I, A-II and A-III classes. Metal parts, especially external ones, are pre-treated with anti-corrosion compounds. nine0003

In the BLOCK company, you can order both wells and elements of wells, working chambers of KL-15 sewer wells, as well as consult with our specialists, select the required concrete wells. You can buy products and consult on general issues of purchase and delivery by calling BLOCK Group of Companies: St. Petersburg: (812) 309-22-09 , Moscow: (495) 646-38-32 , Krasnodar: (861) 279-36-00 . Company working hours: Mon-Fri from 9-00 to 18-00. The BLOCK company delivers reinforced concrete products throughout Russia directly to the customer’s facility or to the construction site, if the infrastructure allows. In our sales department, you can find out in advance to clarify the price from the group «reinforced concrete wells» and calculate the total cost of the order.

Installation of elements of reinforced concrete manholes

The size of the element is selected depending on the purpose of the reinforced concrete manhole being constructed. The diameter of the elements of the wells of the working chambers of the KL-15 sewer wells must correspond to the diameter of the working chamber. Sewer wells and rings are wider than water and gas pipelines. And if the wells will be used for intra-quarter networks, then it should be borne in mind that such pipelines are much narrower. nine0003

Manholes made of concrete elements Working chambers of KL-15 sewer manholes are mounted much easier and faster than other types. So that during installation they do not move out of place, the products are fastened together in four or six places with steel brackets.

For ease of use, the elements of the wells provide a place for installing a gate, a metal ladder or hanging brackets. The brackets are installed in the holes, and the hanging ones are laid at the docking points. Road construction will use the installation of products working chambers of sewer wells KL-15 on a cement mortar of a standard composition of 1: 2. The joints of the elements on all sides are rubbed with this composition and ironed. But even this does not exclude the waterproofing of wells after installation. nine0003

Indicators of acceptance testing of elements of concrete wells working chambers of sewer wells KL-15

  1. Concrete class in terms of strength and tempering strength of concrete;
  2. Compliance with reinforcing and embedded products;
  3. Strength of welded joints;
  4. Concrete cover thickness to reinforcement;
  5. Geometric accuracy;
  6. Concrete surface quality.

The technical passport accompanying a batch of elements of concrete wells, working chambers of KL-15 sewer wells, must contain information on the date of manufacture of the batch, on the number of products, on the results of strength tests, information on the brand of concrete, compressive strength, concrete frost resistance class and waterproof. nine0003

Quality control of elements of manholes working chambers of KL-15 sewer manholes reinforced concrete

As in other reinforced concrete products, there should be no cracks in the working chambers of sewer manholes KL-15. Only barely noticeable to the eye, so-called shrinkage cracks with a width of not more than one tenth of a millimeter, are possible. Minor deviations of the geometric parameters of the rings are possible, not more than ± 5 mm in thickness, ± 6 mm in the diameter of the reinforced concrete product. The surfaces of the product should not have a large number of shells with a diameter of more than 15 mm and a depth of more than 5 mm. Ready-made reinforced concrete wells should not hide the mounting loops of the elements behind the influx of concrete, as this may complicate the installation of parapet slabs. nine0003

Storage and transportation of concrete manhole elements

Concrete manhole elements Working chambers of KL-15 sewer manholes must be stored in stacks in working position, face up. One stack should not consist of more than 3-5 rows, in order to avoid falling and deformation of reinforced concrete products. For delivery, the products are stacked in a stack no higher than 2.5 meters and securely fastened. During transportation and storage between the elements there must be gaskets with a thickness of at least 40 mm. nine0003

BLOCK Group of Companies carries out
delivery of power transmission towers throughout Russia
directly to the customer’s site or to the construction site, if the infrastructure allows.

KL-15

The working chamber KL-15 is a monolithic structure, which is used in the arrangement of gas, water, drainage and sewer systems. The well allows access to engineering communications, and also simplifies the process of maintenance and repair work. nine0003

Since the structure is located underground, the well must withstand heavy loads, protect communications from corrosion, temperature extremes and aggressive environmental influences. That is why, in the manufacture of unified wells, heavy concrete of class B15 (M200) with a high density and a reinforcing mesh up to 1 mm thick are used.

Working chambers (wells) are used when installing communications and facilitating access to engineering systems during repair and maintenance work. In addition, they can perform the function of connecting pressure pipelines located at different depths and help change the operating modes of pipelines. nine0003

Varieties of wells

  • VS and KL — used in the arrangement of drains and storm sewers. The design is a pipe with a bottom and two side holes.
  • VG — used in the arrangement of water and gas systems and serve as a working chamber. The design is a pipe with a bottom, without side holes.
  • VD — used for receiving, accumulating, pumping and distributing wastewater, used in residential and industrial facilities. The well is characterized by increased tightness and frost resistance, withstands any weather conditions. The design is a pipe with a bottom and two side holes. nine0042

Marking

For example, take the working chamber of the well KL-10 , where:

  • KL — the working chamber of the sewer well
  • 10 — internal diameter of the well in decimeters

Design

The well has the shape of a cylinder, consists of several additional rings, is completed with a bottom, gratings and hatches, depending on the installation location of the structure. Light hatches are used in pedestrian areas and parks, heavy hatches are used on the carriageway and roads. nine0003

To avoid flooding of roads during rains, a storm drainage system is installed, including a storm water inlet. It is attached to the well using a frame, which is rolled up with asphalt or cement mortar.

Production

Manufacture of well chambers uses not only high-quality materials, but also the latest center-figuring technology.

The well frame is fixed in a centrifuge and the concrete mixture is distributed using a concrete distributor. After that, the product undergoes heat treatment. This manufacturing method makes unified wells resistant to corrosion and chemically active processes. nine0003

Reinforced concrete wells are the most demanded products in the arrangement and laying of various communications.

Advantages

The main advantages of these products include versatility, strength, durability, tightness and affordable price.

Wells are capable of protecting engineering systems from negative environmental influences for a long time: they are not subject to corrosion, temperature changes, chemical attack and do not absorb foreign odors. nine0003

Products are an important component in the installation of drainage structures, water channels and utilities.